Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Switch In An Equipment Rack - Avaya ERS 4500 Serie Handbuch

Inhaltsverzeichnis

Werbung

Note:
Allow at least 2 inches (5.1 cm) on each side for proper ventilation and at least 5 inches
(12.7 cm) at the back for power cord clearance.

Installing the switch in an equipment rack

Required tool: Phillips screwdriver for attaching brackets to the switch.
Rack requirements:
A space of 2.8 inches for each switch in an EIA or IEC standard 19 inch (48.2 centimeter)
equipment rack.
• The rack must be bolted to the floor and braced, if necessary.
• The rack must be grounded to the same grounding electrode used by the power service in
the area. The ground path must be permanent and must not exceed 1 ohm of resistance
from the rack to the grounding electrode.
The following figures provide instruction for installing the switch in a rack.
Attach a bracket to each side of the switch.
Avaya Ethernet Routing Switch 4500 Series Regulatory Information
Before you begin
November 2010
17

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis