Herunterladen Diese Seite drucken

Werbung

I
GB
F
D
E
RU
PL
ZHI641 / ZHI642
Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it
ISTRUZIONI PER L'INSTALLAZIONE DELLA RUBINETTERIA
INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS
INSTRUCTIONS POUR L'INSTALLATION DE LA ROBINETTERIE
MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
INSTRUKCJE INSTALACJI ARMATURY
ZHI584
ZHI650
Zucchetti Rubinetteria S.p.A.
HIM
ZHI349
ZHI525
ZHI655
ZHI583
ZHI560
Z92202 / Z92203

Werbung

loading

Inhaltszusammenfassung für ZUCCHETTI HIM ZHI584

  • Seite 1 INSTRUKCJE INSTALACJI ARMATURY ZHI583 ZHI584 ZHI349 ZHI641 / ZHI642 ZHI525 ZHI560 ZHI650 Z92202 / Z92203 ZHI655 Zucchetti Rubinetteria S.p.A. Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it...
  • Seite 2 ZHI584 / ZHI349 INSTALLAZIONE / INSTALLATION X<30 X>30...
  • Seite 3 ZHI584 / ZHI349 INSTALLAZIONE / INSTALLATION <1bar <1bar <1bar...
  • Seite 4 ZHI583 INSTALLAZIONE / INSTALLATION Ø 35...
  • Seite 5 ZHI641 / ZHI642 INSTALLAZIONE / INSTALLATION Max 58mm...
  • Seite 6 ZHI641 / ZHI642 INSTALLAZIONE / INSTALLATION...
  • Seite 7 ZHI641 / ZHI642 INSTALLAZIONE / INSTALLATION...
  • Seite 8 Z92202 / Z92203 INSTALLAZIONE / INSTALLATION Max 58mm 17mm...
  • Seite 9 Z92202 / Z92203 INSTALLAZIONE / INSTALLATION...
  • Seite 10 INSTALLAZIONE / INSTALLATION...
  • Seite 11 ZHI525 / ZHI560 INSTALLAZIONE / INSTALLATION...
  • Seite 12 ZHI655 / ZHI650 INSTALLAZIONE / INSTALLATION...
  • Seite 13 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.