Herunterladen Diese Seite drucken

Werbung

BELLAGIO - SAVOY
I
EN
F
D
E
RU
PL
ZW5
Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823
ISY - WOSH
ISTRUZIONI PER L'INSTALLAZIONE DELLA RUBINETTERIA
INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS
INSTRUCTIONS POUR L'INSTALLATION DE LA ROBINETTERIE
MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
INSTRUKCJE INSTALACJI ARMATURY
ZD4 / ZD5 / ZD1 / ZD2 / ZD3
ZUCCHETTI RUBINETTERIA S.p.A.
ZB1 / ZB2
zucchettidesign.it
ZSA / ZSV
1

Werbung

loading

Inhaltszusammenfassung für ZUCCHETTI ISY

  • Seite 1 ISY - WOSH BELLAGIO - SAVOY ISTRUZIONI PER L’INSTALLAZIONE DELLA RUBINETTERIA INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS INSTRUCTIONS POUR L’INSTALLATION DE LA ROBINETTERIE MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ...
  • Seite 2 52 - 79 mm 2.1 – 3.1” 75 - 102 mm 3.0 – 4.0”...
  • Seite 3 R99631—R99632 R99630 5 mm max 3/16” max 5 mm max 3/16” max...
  • Seite 4 40mm 1” 9/16”...
  • Seite 5 INSTALLAZIONE / INSTALLATION 17mm ZD1 077/091/098 ZD2 077/091/098 ZD3 077/091/098 ZD4 077/091/098 ZB1 077/091/098 ZSA 077/091/098 ZD5 077/091/098 ZSV 077/091/098 ZW5 077/091/098 ZB2 077/091/098 (mm) 6-11 12-18 19-25 26-32 33-39...
  • Seite 8 ZD1 / ZD2 / ZD3 / ZD4 / ZD5...
  • Seite 9 ZSA / ZSV...
  • Seite 10 INSTALLAZIONE / INSTALLATION OPERATING INSTRUCTIONS: The lowest handle has a degree scale and it controls the thermostatic element. The button on the handle blocks the maximum rotation at 49°C (120°F) for safety and anti scald purposes. ADJUST TEMPERATURE LIMIT STOP: To increase or decrease the maximum temperature of hot water proceed as follows: •...
  • Seite 11 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.