Effective Febraury 2011
Proceed with the following four steps:
Steps 1 and 2: To install both supplied rubber type interphase
barriers, slide each barrier down between the top and bottom
sets of molded guides. The molded guides will hold the bar-
riers securely in place at the top and bottom. Three barriers
would be required for a four-pole breaker.
Figure 6. Step 1
Figure 7. Step 2
Step 3: Once the barriers are installed, they will feel securely
mounted to the touch and appear as shown.
Instructional Leaflet IL01301021E
Figure 8. Step 3
Step 4: Reverse the procedure to remove the barriers from
the fixed breaker.