Herunterladen Inhalt Inhalt Diese Seite drucken

Routine Maintenance - Atlas Filtri OASIS DPRO Installationsanweisungen

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 37
2.6 Start up
The OASIS DP osmotic membrane is supplied dampened with a maintenance solution. Before using water, run for at least
10-15 minutes, flowing from the dedicated tap.
Absolutely prevent the membrane from drying by incautiously opening the unit. Install the membrane right after opening
the package.
For UV, PUMP and PUMP UV models, never disconnect the power mains, always keeping the unit on.
In the UV lamp version, the first water flow when the tap is opened may be warm. Run water for several seconds before
use.
Never turn off the UV lamp; if turned off, wait at least 30 minutes before turning it back on.

3. ROUTINE MAINTENANCE

Before performing any routine maintenance, make sure the power cord is unplugged.
Routine maintenance only refers to consumable part replacement.
We recommend routine maintenance be performed at least once every 3 months.
ELEMENT TO BE CHECKED
Unit
Filter cartridges
AIC and AIM post-filters
UV lamp
RO Membrane
(*) Special water conditions may require more frequent maintenance.
The PUMP, UV and PUMP-UV model electrical devices are powered with 220V - 50/60 Hz electrical current.
Before performing any maintenance, make sure the power cord is unplugged.
To clean the device, do not use corrosive or acidic products or steel wool or steel brushes.
Do not clean the device with direct jets of water or at high pressure.
3.1 UV lamp replacement
The machine is equipped with a UV germicide lamp whose working life is estimated at 8000 hours.
Ultraviolet ray lamps are hazardous to the eyes, avoid direct exposure.
Remove the rubber cap.
Gently remove the used UV lamp from the quartz tube.
Disconnect the lamp upper connector and end cable.
Replace the lamp and reassemble in its housing.
Connect the power cord.
|
10
OASIS DP RO
CHECK
Visually check integrity and conditions
General cleaning
Functional check
Replacement
Replacement
Replacement
Replacement
FREQUENCY
3-6 months (*)
3-6 months (*)
3 months (*)
8000 hours (*)
3 years (*)

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Oasis dp sanic ro

Inhaltsverzeichnis