Pre start-up inspection.
The following Pre-start-up inspection must be performed before the start of each work session or after every four hours of use,
3. Check the engine oil level and top up as necessary.
4. Check the engine fuel level and top up as necessary.
5. Check for fuel and oil leaks.
WARNING
Petrol Machines
Starting Procedure
Be sure the fuel tank is full. Use the recommended fuel to run the engine
from its instruction booklet.
Check engine oil levels .
Turn the engines stop switch clockwise to the position 'I'.
Open the fuel cock.
position.
If the engine is warm of the ambient temperature is high, close the
choke lever half way, or keep it open fully. If the engine is cold, or the
ambient temperature is low, close the choke lever.
Pull the starter handle slowly until the resistence is felt. Return the
handle to its original position and pull swiftly.
Allow a longer warm up period in colder temperatures.
Operation
Guiding the trowel on the slab is very simple. Get into the operator's
position behing the centre of the handle, attain a good footing and apply
Slightly twist to the left and the machine will move to the left. The machine will remain stationary if you do not apply any force up
or down.
Stopping the Engine
machine lastly.
Electric Machines
Starting Procedure
Operation
Stopping the Motor
(Note: The illustration above is of the Pro 900, but the instructions are correct for the Pro 600X)

Pre-start Checks

Operating Instructions
Before you operate or carry out any maintenance on this machine YOU MUST READ and STUDY
this manual.
9