Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Transport; Lifting And Handling; Positioning - ifi START UP Benutzerhand- Und Wartungsbuch

Vorschau ausblenden Andere Handbücher für START UP:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39

2 INSTALLATION

2.1 TRANSPORT

7ZR ZRRGHQ SODQNV DUH ¿[HG WR WKH EDVH VWUXFWXUH
in a longitudinal manner.
The counter is dispatched normally using transport
vehicles over land.
The normal packaging is made up from a
polyethylene covering and the company will supply
particular packaging, on request.

2.2 LIFTING AND HANDLING

The counter is lifted from the means of transport by
D IRUN OLIW WUXFN ¿J 
ATTENTION!
The fork on the lifting truck must measure
at least 1m/3.2 ft, in length.
Position the display case by placing the
barycentre in the centre of the lighting
truck forks support area.
Fig. 5
Fig. 6
Once on the ground, it is recommended to remove
the packaging in order to be able to check integrity
and the absence of damage due to transport.
NOTE!
The carrier must be informed of any
damage immediately. In no case must
the damaged display unit be returned to
the manufacturer without forewarning or
previous written authorisation.

2.3 POSITIONING

Before installation, the following must be taken into
consideration:
-
remove all parts of the packaging protecting the
counter.
-
Position the counter in a dry, non-dusty place.
- A space must be envisioned around the Start Up
that is suitable for the operator (in order to carry
28

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für ifi START UP

Inhaltsverzeichnis