Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection - Fonderie SIME 3 OF Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 85
proceed as follows (fig. 5):
– fit the lower front (1) and back (2)
brackets to the heads with the four TE
screws supplied;
– insert the upper bracket (5) fixing it to
the front head with the two TE screws.
– insulate the cast iron body with glass
wool, fixing it with the two springs sup-
plied;
– assemble the panel (11) making sure
that the TE screws are already fitted on
the combustion chamber door.
– fit the left side (3) and the right side (4)
by inserting them in the tangs on the
brackets (1-2) depending on the model.
– fix the sides to the upper brackets (5 - 1)
with the four self-tapping screws sup-
plied;
– fit the two back panels (6) and (7) of the
sides with the ten self-tapping screws
supplied;
– fit the control panel (9) inserting the two
lower tangs of the panel on the drains on
the sides, and fix it with the four self-tap-
ping screws supplied. Before carrying
out this operation unwind the capillaries
of the two thermostats and the thermo-
meter and place the respective feelers
in the sheath (10), fixing all with a capil-
lary pin;
– fit the front panel (8) fixing it to the sides
with pin clutches;
– complete the assembly by fixing the lid
(12) to the sides with pin clutches.
NOTE: Remove the "Testing Certificate"
from inside the combustion chamber and
keep together with the instructions manual.
2.6
ELECTRICAL
CONNECTION
The boiler is fitted with an electricity cable,
and requires a 1ph - 230V - 50Hz power
supply through the main switch protected
B1
B4
1
1
L
N
1
2
3
4
TS
IG
TC
RONDÒ' - ESTELLE
KEY
L
Line
N
Neutral
IG
Main switch
TS
Safety stat
TC
Boiler stat
SA
Green voltage LED
P
C.H. pump
B
Direct Feeding Burner (not supplied)
by fuses.
The room thermostat (required for
enhanced room temperature control)
should be installed as shown in fig. 6.
Connect the burner with the cable supplied.
NOTE:
Device must be connected to an efficient
earthing system.
SIME declines all responsibility for injury
caused to persons due to failure to earth
the boiler. Always turn off the power sup-
ply before doing any work on the electri-
cal panel.
5
6
7
8
9 10
SA
OP
BA100 - BA150 - BA200 storage tank
TB
PB
C
2
1
PI
L N
1
2
3
4
5 6
NC
NA
R
C
B1
Permanent Feeding Burner (not supplied)
TA
Room stat
OP
Programmer's clock (optional)
NOTE: When a room stat is to be fitted remove
the link between terminal 4 and 5 on the connec-
tor plug. To connect the programmer's clock
(OP), remove the link between terminals 5 and 8.
NOTE: The brown (capped off)
cable has to be exclusively used
in case of permanent feeding
burners (type B1).
2.6. 1

Electrical connection

to the BA boiler unit
To connect the boiler to the boiler unit pro-
ceed with the following operations:
– remove the casing lid of the boiler and
the back protection of the control panel
in order to have access to the terminal
board of the boiler;
– remove the protection of the boiler unit
to have access to the terminal board of
the boiler unit (fig. 7);
– connect the cables as shown in the dia-
gram (fig. 6/a).
KEY
L
Line
N
Neutral
IG
Main switch
TS
Safety stat
TC
Boiler stat
SA
Green voltage LED
P
C.H. pump
B1 Permanent Feeding Burner
(not supplied)
OP
Programmer's clock (optional)
PB
D.H.W. pump
TB
D.H.W. stat
R
Relais
NOTE: To connect the ambient thermo-
stat (TA), remove the link between termi-
nals 1-5 of the boiler unit terminal block.
Remove links 4-5 and 8-9 from the boiler
terminal block.
To connect the programmer's clock (OP),
remove the link between terminals 5-8.
Fig. 6
Fig. 6/a
39

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

4 of5 of6 of7 of8 of

Inhaltsverzeichnis