Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Space - Toshiba RBM-PMV0361E Installations-Handbuch

Pmv kit
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3
SELECTION OF INSTALLATION PLACE

Installation space

• Make space for installation and service. (Make space to the electrical parts box cover side for service.)
• When installing the unit inside the ceiling, be sure to create a check port.
The check port is required when the unit is installed and serviced. (Check port: 450 × 450 or more)
• Keep a clearance of 50mm or more between the top panel of the unit and the ceiling.
• The length of a connection pipe to the indoor unit should be 2 m to 10 m.
Installation space
RBM-PMV0361E, RBM-PMV0901E
55
200 or more
RBM-PMV0901E (When attached joint is used)
73
200 or more
55
200 or more
73
200 or more
5
Box cover
Check port
450 × 450

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rbm-pmv0901e

Inhaltsverzeichnis