Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 51

WIRING DIAGRAM

The wiring scheme to be carried out by technician are:
— Power Supply Line
— Thermostats Line
— Eventual blocking lamp and/or hour-meter
WARNING:
- Do not invert the neutral with the phase.
- Make the connection to an effi cient earthing system.
- Bridge 3-8 on base is found only on versions withouth preheater.
Key
CO
Hour-meter (possible)
F
Fuse
FA
Anti-interference filter
FR
Photoresistance
IG
Main switch
LS
Lock-out warning light (possible)
MA
Control unit terminal board
MB
Burner motor
PB
Burner connector
PR
Preheater (only mod.PR)
SC
Plug
TA-TC Boiler environment thermostat
TR
Ignition transformer
TS
Safety thermostat
Tm
Minimum thermostat
UK
VE
Solenoid valve
28
1
2
2 2 3 4 5 6 7 8
MA
FA
M
MB
VE
B4
CO
H
N
101112
9
Tm
PR
TR
PB
S3
T2 T1 N
L1
SC
TS
Z
TC-TA
F
LS
IG
N
L
N
FR

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Joannes AZ 4

Diese Anleitung auch für:

Az 4 pr

Inhaltsverzeichnis