Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Array Rigging - Bose ArenaMatch DeltaQ Installationsanleitung

Inhaltsverzeichnis

Werbung

PRO.BOSE.COM

Installation

WARNING: The loudspeaker and all mounting components must be inspected
annually by a qualified professional who is trained and certified in suspending
loudspeaker systems. All rigging parts and components used in the
suspension of the loudspeaker system should be visually inspected for signs
of cracking, bending, water damage, corrosion, de-lamination, or any other
condition that could comprise the system's integrity and create a dangerous
falling hazard.

Array Rigging

ArenaMatch DeltaQ array loudspeakers include four M12 threaded inserts per side,
designed to be used with optional ArenaMatch rigging accessories. Additionally,
the M10 and M6 inserts on each side are designed to be used with the optional
ArenaMatch U-bracket accessory.
Note: Always confirm safe working load limits with exact array configurations,
pitch angles, and connection points using approved array design software. See the
ArenaMatch product page at PRO.BOSE.COM for a complete list of approved array
design software.
Note: All lifting operations require two individuals positioned on each side of the
loudspeaker.
CAUTION: To maintain weather resistance, after installation, ensure all
loudspeaker module inserts are sealed, all coatings remain undamaged, and
all modules are installed with sufficient downward pitch.
CAUTION: Use only Bose ArenaMatch loudspeaker hardware, or custom
suspension hardware designed and approved by qualified, professional
engineering service providers.
Installation Guide • ArenaMatch RIgging Accessories
Installation
English • 13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis