Herunterladen Inhalt Inhalt Diese Seite drucken

Dell PowerConnect W-AP120 Installationsanleitung Seite 5

Vorschau ausblenden Andere Handbücher für PowerConnect W-AP120:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 13
Figure 4
Using the Integrated Ceiling Tile Rail Slots
The snap-in tile rail slots on the rear of the AP can be used to securely attach the device directly to a 15/16" wide,
standard ceiling tile rail.
Caution: Make sure the AP fits securely on the ceiling tile rail when hanging the device from the ceiling, because poor
installation could cause it to fall onto people or equipment.
1. Pull the necessary cables through a prepared hole in the ceiling tile near where the AP will be placed.
2. If necessary, connect the console cable to the console port on the back of the AP.
3. Hold the AP next to the ceiling tile rail with the ceiling tile rail mounting slots at approximately a 30-degree
angle to the ceiling tile rail (see
Figure 5
4. Pushing toward the ceiling tile, rotate the AP clockwise until the device clicks into place on the ceiling tile rail.
5. On the W-AP121 or W-AP125, orient the antennas. For best results, rotate the antennas so that they are
vertical (perpendicular to the body of the AP) (see
Dell PowerConnect W-AP120 Series AP | Installation Guide
Antenna Interfaces on the W-AP120/W-AP124
Figure
Orienting the Ceiling Tile Rail Mounting Slots
5). Make sure that any cable slack is above the ceiling tile.
Figure
6).
ap
ap1
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis