Floor standing boiler

A power supply via an earthed safety plug is not permissible.
▶ Ensure the power supply is connected to the correct
phases.
▶ In accordance with the specifications in the documentation
for the relevant wall mounted boiler, close the function
module cover and commission the boiler.
NOTICE:
Material damage due to dry running!
Connected pumps can start as soon as the system is switched
on unless the control unit has not detected the module.
▶ Fill the system before switching it on so that the pumps do
not run dry.
A higher-level control unit must be installed to ensure problem-
free operation of the xM10 function modules.
▶ When commissioning, make all the required settings with
the help of the service instructions provided.
▶ Check that the system conditions are set correctly in the
control unit.
18
4
Floor standing boiler
This chapter explains how to install the xM10 function modules
in the Logamatic MX25/MC110/MC10 control unit for floor
standing boilers.
At most, two xM10 function modules can be integrated in a
floor standing boiler.
▶ Undo 2 screws on the cover hood ( Fig. 15).
▶ Remove the cover hood by pulling it upwards in the
direction indicated by the arrow.
Fig. 15
Removing the cover hood
▶ Guide the outer rear locking hooks on the function module
into the tabs on the control unit.
▶ Press the front of the module downwards.
2
Fig. 16
Insert the function module, ensuring that it is
engaged
[1] Function module in slot 1
[2] Function module in slot 2 (if required)
1
0010016974-001
xM10 – 6720866989 (2017/10)
0010016973-001