Herunterladen Inhalt Inhalt Diese Seite drucken

Villeroy & Boch QUARYL Installation - Wartung - Gewährleistung Seite 12

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 8
English
1. FITTING INSTRUCTIONS
1.1. UNPACKING
To avoid damage in transport, the bath is packed in carton with
protective tape along the rim, which has to be removed
(see figure 1). Check if the inside of the bath is undamaged
before installing it.
1.2. MAKING THE OVERFLOW OPENING
For baths for which the overflow opening is not made in advance,
you can determine its position yourself. The centre of the over-
flow opening to be drilled is indicated. Select the overflow posi-
tion you prefer and follow the instructions below.
Drill out
1. Fit the hole saw supplied to your drilling machine.
2. Drill out the opening from the outward side, positioning the
bit of the hole saw in the centre of the circle of the overflow
position desired (see figure 3).
3. To fit the drain/overflow combination, see point 1.4.
1.3. Assembly of legs
Below are instructions for attaching the legs to Quaryl
Quaryl
®
baths must be installed using the legs supplied. Never
use screws as fasteners! They are bonded under the bath using
the double-sided tape which is supplied ready fixed to the steel
channel leg supports. Set the whole unit on its legs at the place of
installation, as close to the wall as possible and make sure all
sides are horizontal, using a spirit level along the edges (not on
the bottom!; see figure 4). Check to see that all the legs reach the
floor and tighten the locking nuts after adjustment (see figure 5).
Do not fix the feet into concrete!
1. Clean the underside of the bath where the legs are to be fitted,
taking care to remove any grease (see figure 6).
2. Remove the film covering the double-sided tape on the legs.
3. Bond the legs to the underside of the bath and press down
firmly.
1.4. DRAIN/OVERFLOW COMBINATION
The drain/overflow combination is not supplied with the bathtub.
Fit this as instructed by the supplier and connect it to the drain.
Then check for water-leakage.
It is advisable for the drain to be kept accessible through an
inspection opening of at least 30 x 30 cm.
1.5. SUPPORT
The edges of the bathtub should be supported around. You can do
this by having a batten fitted against the wall or a horizontal
recess made previously.
It is essential to leave a gap of at least 3 mm between the bath
and the wall/tiles (see figure 7, 8 and 9).
12
®
baths.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis