Herunterladen Inhalt Inhalt Diese Seite drucken

Delivery And Handling - Berkel BS+2400 F Bedienungs- Und Wartungsanleitungen

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 65
3 Testing, transport, delivery and installation
3.1
Testing
Your machine has been tested at our factory to ensure correct operation and regu-
lation. During testing, cutting tests are performed on material identical to the mate-
rial cut by the user.
3.2

Delivery and handling

950
board on pallet. The dimensions of the packing are shown in Fig. 3.2.1. Upon re-
ceipt of the machine, check that the packing is intact. If it has been damaged, sign
the carrier's delivery note but add: "I accept, with reservation.........." and the rea-
son. If, once the package has been opened, some of the machine components are
found to be damaged, report the fact to the forwarding agent within three days
from the date specified in the documents.
3.2.1
List of provided equipment
The following equipment is included in the machine packing:
N° 1 use and maintenance manual
Fig.3.2.1
1960
All the equipment delivered di thoroughly
checked before delivery to the forwarding
1050
agent.
reached otherwise with the customer or trans-
port conditions are particularly critical, the
machine will be wrapped in nylon and card-
When packed, the machine weights 125 kg.
NOTE
Measures are expressed in millimetres.
Unless
agreements
18
have
been

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis