Herunterladen Inhalt Inhalt Diese Seite drucken

Olsberg 41/605 Anleitung Seite 29

Aracar compact
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

● Measure the length of the stove pipe and adjust the
pipe accordingly.
● Unscrew the waste air duct from the appliance.
● Slip the elbow pipe with the stove pipe onto the waste
air duct and slide it through the hole in the insulation
board and then tightly into the wall lining (see Fig.5).
Notice: Fit the waste air duct onto the appliance in
such a way that the slotted holes face in the
direction where the stove pipe is inserted into
the wall lining.
● Re-tighten the waste air duct on the appliance.
Important: The stove pipe connections must be
sealed. The stove pipe must not project
into the chimney.
Fig.5
● Important!
Before gluing together cladding panels 3+4 (Fig.6):
Place cladding panels 3+4 on a level surface in their
installation position and glue them together before
screwing them together using 2 chipboard screws
Ø5x60 (19).
Insert the air grille frame (10) into the cladding (4) from
the rear and fix it in place using 4 chipboard screws
Ø4x20 (18).
Screw plaster frame bottom (11) to cladding boards 3+4
using 3 countersunk screws M5x35 (20), washers (21)
and hexagon screws M5 (22).
Position the pre-assembled cladding panels 3+4 on the
base plate, glue them together with insulation boards
1+2 and screw them together with 2 chipboard screws
Ø6x140 (17).
2
4
11 22 21
17
1
3
Fig.6
1
4
3
20
10
18
2
19
4
17
29

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

41/606

Inhaltsverzeichnis