Herunterladen Inhalt Inhalt Diese Seite drucken

Villeroy & Boch CETA Installation - Wartung - Gewährleistung Seite 18

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
POSITIONING THE BATH ON THE BATHROOM
FLOOR
For Ceta/Nexia: Remove the sealing plugs from inside the feet. Adjusting
the hexagonal bolts (M 10) at the inside of the bath feet (under), make sure
the bath is horizontal (for Ceta see figure 2b, c, for Nexia see figure 3a, b).
After the bath is adjusted correctly, put the sealing plugs back into the feet.
For Hommage: adjust the bath by turning the adjusting feet (see figure 4a, b).
For Ceta, Hommage and Nexia: Then apply some silicon at the position
of the feet to fix the bath to the floor. Put the bath at the marked positions.
Remove the superfluous silicon and smear it evenly so as to get a smooth
layer around the feet. Allow the silicon to dry for 24 hours, before using
the bath. The use of silicon ensures that the bath should not require any
additional support.
For New Haven: The pre-installation set (Jado, art. nr. 826025) should be
installed in the unfinished floor when using the Jado bathtub tower (art.nr.
826020). Supply pipes and underfloor heating should not be laid in the
vicinity of the tower and the bath (see figures 5a, b, c and d).
750
520
20
620
285
18
Adjusting
foot
Silicon
Adjusting
foot
Silicon
1750
1165
1325
135
52
670
490
470
3a
3b
4a
4b
5a
Ceta 175

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis