Herunterladen Diese Seite drucken

Initial Configuration - VOSS.farming Fence Inspektor Handbuch

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
min. 5 m

Initial configuration:

The tester must be first tuned to the pulse of the energiser (positive kV+
or negative kV- , symbol (1) is shown on display).
1.
Go to the point where the fence connection cable is connected to the fence.
2.
Hold the tester against the conductor and push the button (6).
3.
If the arrow (7) points away from the energiser then the tester is correctly set.
If the arrow points toward the energiser then the polarity must be changed, i.e.:
1.
Remove the tester from the fence.
2.
Push the button (6) for 10 seconds. After 10 seconds the tester beeps. Continue to hold
the button (6). After another 5 seconds the tester beeps again and the polarity changes
from kV+ to kV- or vice versa.
Functionality:
Current seeks the path of least resistance. If there is a short circuit (e.g. vegetation) on the
fence then more current will flow in that direction.
With the aid of the tester you are able to ascertain where there is a "leakage" in your fence
system. Once the "leakage" is eliminated the voltage on the fence rises and with it the
impulse strength.
The display:
An arrow points in the direction of the leakage (>4 amps).
The current value is briefly shown in the top right corner of the display,
before the fence voltage appears.
ca. 50 m
CHECK
EN

Werbung

loading

Verwandte Produkte für VOSS.farming Fence Inspektor