Herunterladen Inhalt Inhalt Diese Seite drucken

Vapor 3000 Gebrauchsanweisung Seite 29

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 56
CONNECTING THE HOSE
- Open the flap (L) and introduce the quick connection
(M) of the work hose in the accessories socket. Push in
as far as it will go. (Fig. 8).
- Close the flap (L) so that it bears against the side of
the quick connection (M) (Fig. 9).
c) Approximately 2 minutes after the heating process has
been activated in the boiler, press the steam or red button
(18) provided on the handle (fig. 10) and bleed for
about 10 seconds any air or condensation that may have
formed in the boiler.
d) When the green light (E) comes on, the generator will
be ready for use.
Under normal operating conditions, the green
warning light (E) will keep turning itself on and
off. This indicates that steam is being generated
in the boiler and that the appliance is operating
normally.
NOTE
Fig. 8
Fig. 9
Fig. 10
25
L
M
M
18
19
L

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis