Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Of The Hood Canopy C - Küppersbusch KD 674.1GE Bedienungsanweisung Mit Montageanweisungen

Vorschau ausblenden Andere Handbücher für KD 674.1GE:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 36
Part 1 - INSTALLATION INSTRUCTIONS

4.2 - Installation of the hood canopy C

1 - Drilling the wall
a) Mark on the wall the centres of holes 1 for fixing of the hood canopy C. The centre of
hole 2 for fixing the chimney, (fig. 5a) air outlet directed upwards or towards the wall,
(fig. 5b-c) air outlet to the right or left hand side, must be marked at a distance X
from the line between holes 1, obtained by measuring the extension Z of the chimney
required for installation, plus 11 mm X=Z+18-7. Using a Ø8 mm drill bit, drill the
points marked in this way.
5 a
5 a
A08_05
b) When installed with the air outlet directed towards the wall
(fig. 5a), it will be necessary to drill an air ducting opening,
measuring Ø120 or 150 mm, according to the diameter of
the flange F provided.
2 - Fitting the fixing elements
a) Insert the rawl plugs provided into holes 1 and 2.
b) Fit the eye bolts O (fig. 6).
c) Fix the wall bracket S in hole 2 using the screw V provided
(fig. 7).
5 b
2
1
1
ø 8
100 100
5 b
105
2
1
1
5 c
5 c
105
2
1
1
6
6
7
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kd 974.1ge

Inhaltsverzeichnis