Herunterladen Diese Seite drucken

Seagate BARRACUDA ST31250ND Installationsanleitung Seite 19

Vorschau ausblenden Andere Handbücher für BARRACUDA ST31250ND:

Werbung

16
DC power requirements
Voltage regulation
Maximum operating current
Maximum starting current
Peak DC
Peak AC
Delayed motor start (max)
Peak operating current
1, 10
Typ DC
Max DC
Max (peak)
Track following (DC)
1
at OD
1
at ID
Read track
1, 14
OD DC
AC
Seeking
Typical DC
Maximum DC
Maximum (peak) AC
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Barracuda 2LP Installation Guide, Rev. E
Single-ended
+ + + + + 5V
+ + + + + 12V
11
± ± ± ± ± 5%
± ± ± ± ± 5%
5
1
0.93
0.6
3, 6
0.93
1.35
3
1.93
1,4
0.88
0.12
0.91
0.57
1
0.93
0.60
1.00
1.56
0.91
0.5
0.88
0.51
0.96
0.53
1.03
0.73
1, 13
0.89
0.78
1
0.92
0.82
0.95
1.60
Differential
+ + + + + 5V
+ + + + + 12V
11
± ± ± ± ± 5%
± ± ± ± ± 5%
2
2
Amps
1.17
0.6
1.00
1.35
1.93
0.92
0.12
1.13
0.57
1.17
0.60
1.95
1.56
0.99
0.50
0.96
0.51
1.35
0.53
1.95
0.73
0.99
0.78
1.10
0.82
1.67
1.60

Werbung

loading