Herunterladen Inhalt Inhalt Diese Seite drucken

Start Up; Shut Down; Preparing The Icemaker For Long Storage - Hoshizaki FM-150AKE-HC-SB Bedienungsanleitung

Eisbereiter für separaten vorratsbehälter
Vorschau ausblenden Andere Handbücher für FM-150AKE-HC-SB:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
All parts are factory-adjusted. Improper adjustments may result in failure.
If the unit is turned off, wait for at least 3 minutes before restarting the icemaker to prevent damage to the compressor.
This icemaker is designed to produce edible ice. To keep the icemaker hygienic:
* Wash your hands before removing ice. Use the plastic scoop provided (accessory).
* The storage bin is for ice use only. Do not store anything else in the bin nor use other electrical appliances in the bin.
* Clean the storage bin before use (see "III. 1. CLEANING").
* Keep the scoop clean. Clean it by using a neutral cleaner and rinse thoroughly.
* Close the door after removing ice to prevent entrance of dirt, dust or insects into the storage bin.

1. START UP

The installer will normally commission the icemaker to start the
automatic icemaking process. To ensure continuous operation, make
sure that:
* The water supply tap is on, and
* The icemaker is connected to the power supply.
To start the icemaking process, check the position of the operation
switch on the operation panel:
"OFF" position - Move it to the "ON" position.
"ON" position - Press the ice button.

2. SHUT DOWN

Press the stop button on the operation panel. The "STOP" and "DRAIN"
modes light up on the display. Then, only the "DRAIN" mode goes off.

3. PREPARING THE ICEMAKER FOR LONG STORAGE

This icemaker will not work at subfreezing temperatures. To prevent damage to the water supply line, drain the icemaker when
air temperature is below zero.
When shutting down the icemaker for two or more days, drain the icemaker to prevent contamination in the water circuit.
1) Follow the instructions in "2. SHUT DOWN".
2) Close the water supply line shut-off valve.
3) Open the drain valve.
4) Press the ice button on the operation panel to drain the water circuit.
5) When no more water comes out of the drain valve, press the stop button.
6) Move the operation switch to the "OFF" position, and disconnect the power supply.
7) Close the drain valve.
8) Remove all ice from the storage bin, and clean the bin.
NOTICE
HYGIENE
Ice Button
Maintenance Button
(service use only)
NOTICE
HYGIENE
5
ENGLISH
Operation Panel
Display
Stop Button
Operation Switch

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis