Herunterladen Diese Seite drucken

oscartielle Urano Betriebsanleitung Seite 21

Kühltruhen
Vorschau ausblenden Andere Handbücher für Urano:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 31
conditions of directive 2006/42/CE and national laws transposing the same directive, in other words until the machinery
which this declaration refers to, will make up a whole with the final machinery.
17 – Multiplexing instruction for Urano back to back
Before starting to multiplex two cabinets Urano back to back, remove the protective film on the plates.
Turn the feet in order to obtain a perfect alignment of the units. Then proceed as per following instruction (FIG: 13 page 5)
1. Fix top spacers on the back of one case. Holes are already predisposed.
2. Bring near the other case and ensure that they are perfectly aligned. Do not screw the top spacers to the other case.
3. Remove the dowels as per FIG. 13 page 5, only in case of external lights or any other accessory
4. Assemble the top carter and screw only side spacers (3 pieces each side) to both cases. Holes are already drilled.
5. Install side carters.
6. Install cover using a drop of silicon (only in case of external lights or any other accessory)
18 – Electrical diagrams
The electrical diagram of the electronic control is enclosed to this manual. The electrical diagrams are on page 6 and 7.
Legend:
CE =
Electronic device
TR =
Transformer 230V / 12V
M1 =
Compressor
ST =
Temperature probe
R2 =
Anti-mist heater
R3 =
Dripping heating
EV =
Solenoid
IL =
Lights
F =
Phase
19 - Conformity Declaration
A copy of the declaration of product conformity can be requested by filling in the form available a the internet address:
http://www.oscartielle.it/conformity
19

Werbung

loading

Verwandte Produkte für oscartielle Urano