Herunterladen Diese Seite drucken

Sägeblattwechsel - PEUGEOT ENERGYSaw 254DB Bedienungsanleitung

Radialgehrlingssäge mit doppelneigung

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 42
1. Loosen the hex bolt (B) using an
Allen key.
2. Loosen the locking knob (C).
3. Slide the extension to the desired position and tighten the
bolt (B) and then the knob (C).
Y
CAUTION! Please remove the right extension support guide completely when using the mitre saw at 45°. Remember to
replace the guide after the cut.
6. FITTING THE DUST BAG
1. Insert the dust bag (A) Fig.5 in the connection port
(B) on the back of the saw head and check that it is
properly attached.
2. If you wish to improve the suction, a vacuum cleaner with a
dust suction hose can be connected directly
to the saw's elbow extraction.
NOTE: For best suction results, empty the bag
regularly to avoid congestion (when
half full). The bag has a zip for
easier emptying. This makes for better
airflow through the dust bag. The bag can also
be rinsed in warm soapy water and dried before being
reused.
Make sure the bag is properly attached to the connection port
and that the bag's zip is securely closed
before turning on the saw.
Y
CAUTION! Dust particles can cause respiratory problems. Wearing a dust mask that complies with the current stand-
ards is recommended for your protection.
7. FITTING THE SIDE EXTENSIONS
The mitre saw comes with two extensions to support large pieces of wood and thus prevent them sagging while you saw.
Extensions can
be mounted on both sides of the saw, depending on the
dimensions of the piece of wood.
The lateral extensions must be installed before attaching the
saw to a bench or a table.
1. Tighten the tilt knob so that the blade
cannot move.
2. Lower the table rotation handle so that
the table cannot be moved.
3. Unscrew the locking knob (A) Fig.6.
4. Insert the table extension (B) in the two holes found
in the base of the saw.
5. Lock the side extension in place by screwing the
locking knob (A).
6. Repeat steps 3-5 to install the second
lateral extension.
31
4
5
6

Werbung

loading