Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - Simons Voss Technologies MOD.SOM8 Kurzanleitung

Vorschau ausblenden Andere Handbücher für MOD.SOM8:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3

5. Installation

5 Installation
24 / 132
5. Use a transponder to activate SmartRelay in its as-
delivered condition.
All outputs on the SmartOutput module are
9
activated (all output LEDs will light up).
SmartOutput module tested (see
ü
installation [
ü
DIN rails available for installation.
1. Fit the SmartOutput module onto the DIN rail.
2. Switch off the power supply.
3. Connect all cables (see Connections).
4. Switch on the power supply.
ATTENTION
Check polarity is correct.
5. Use the LSM software to programme the controller
(see Programming and configuration).
6. Use authorised transponders to check the
controller functions correctly.
 23]
).
}
MOD.SOM8
Before
EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis