Connecting the boiler
3
This chapter will explain how to make
all connections to the boiler with regard
to:
Hydraulic connections
Condensate drain connection
Gas connection
Flue gas connection
Air intake connection
Electrical connection
The boiler should always be connected
in such a way, that the system applies
to all relevant standards and
regulations (European, national and
local). It's the responsibility of the
installer to ensure that all standards
and regulations are respected.
6
Hydraulic connections
The boiler should always be connected
in such a way, that water flow through
the boiler can be ensured at all times.
Connect the flow (4) and return (5)
connection of the system tension free
to the boiler connections. If the boiler is
used in a system with two return
circuits, the common return becomes
the low temperature return, the 2nd
return connection (6) is the high
temperature return (remove cap/flange
before connecting).
The (optional) accessory kit with safety
valve, manometer and deaerator
should be mounted on the flow
connection (4) of the boiler, before
connecting to the system.
The (optional) pump kit should be
mounted directly to the return
connection (5) of the boiler, before
connecting to the system.
Condensate connection (7)
After filling with water, the syphon
(included in delivery) should be
installed to the connection at the
bottom of the condensate receptacle.
Lead the hose under the frame at the
back of the boiler and connect it to the
draining system in the boiler room.
The connection to the draining system
should always be done with an open
connection, in order to avoid a flooding
of the boiler in case of a blocked drain.