Herunterladen Inhalt Inhalt Diese Seite drucken

ABB i-bus 6120 U-101-500 Betriebsanleitung Seite 12

Up-busankoppler für unterputzmontage
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
GB
Important Information
CAUTION
Work on the EIB bus may only be carried out by
authorized electricians. The laying and connection of
the bus line, as well as the connection of the applica-
tion devices, must be carried out in accordance with
the applicable DIN-VDE Guidelines, as well as the EIB
Manual of the ZVEI/ZVEH.
The manufacturer's database from ABB is constantly being
supplemented. It contains the latest applications and the
relevant descriptions. Should you not be in possession of
the database, please request this from us.
Disposal
All packaging materials and equipment from ABB are
furnished with labels and seals of inspection for proper
disposal. Dispose of packaging materials, electrical appli-
ances and their electronic components through authorized
collecting points or waste disposal companies.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

I-bus gj b000 6120 a0063

Inhaltsverzeichnis