Connecting AC Power to the Power Center using an Automatic Timer
Connect AC power using an automatic timer to the power center as follows:
1. IMPORTANT WARNING: Be sure that the Power Center AC power line is switched OFF before connecting AC power to
the Power Center.
2. Use 12-14 AWG three conductor insulated wire for the main AC power connection. Connect the Power Center to pool
pump AC power source. The Power Center should be connected to the pump motor switch or automatic timer.
3. Attach incoming GROUND wire to the ground lug inside the Power Center.
4. Earth Bonding (Grounding): Connect the earth wire to the GROUND BONDING LUG located on the bottom of the Power
Center enclosure. Earth bonding is necessary to ensure personal safety and safety of equipment.
IMPORTANT: A number 8-gauge (8.4 mm) wire is recommended when connecting the power supply to a Permanent Earth
Ground connection that is acceptable to the local inspection authority. Attach the bonding point located on bottom of
the Power Center to a Common Earth Bonding Point. Do not use the iCHLOR as the Common Bonding Point. Each piece
of non-chlorinator pool equipment requiring a ground should be bonded to the Common Approved Earth Bonding Point.
Never ground pool pump to Power Center.
5. Reinstall the Power Center cover and secure with the cover screw.
6. The Power Center installation is complete. For iCHLOR operating information, refer to the iCHLOR User's Guide.
Connect incoming ground
wire to GROUND lug
Attach incoming power wires
from load center-filter pump relay
(12-14 AWG 3wire) to iCHLOR
Power Center AC power wires
Conduit knockout for AC
power cable source
iCHLOR Power Center (cover removed)
7
Ground bonding lug

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis