Herunterladen Inhalt Inhalt Diese Seite drucken

wehncke Evolution Aufbauanleitung Seite 8

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Fix the separate wall in the middle of the inner tent by rings and toggles (ill. 3).
5. Fix the PE floor in the living room of the tent with pegs which are put through rings of
ring-pin-system and eyelets of PE floor.
Taking the tent down
Preparations:
Clean and dry the tent inside and out.
1. Close the zips.
2. Remove the guy lines.
3. Remove all nail pegs from the ground.
4. Remove the separate wall and the inner tent. Push the rods out of the channels.
5. Pull the spike out of the rod at each corner.
6. Push the rods out of the channels one after the other.
7. Fold and roll the tent to the right size for the bag.
Packing
1. Pack the cleaned nail pegs and the frame rods in the bags provided.
2. Place all parts of the tent in the carrying bag. They should be as clean and dry as pos-
sible.
If any parts of the tent are still wet, you should remove them from the bag and dry them as
soon as possible, e.g. on arriving home.
Attention!
When you are working with rods in general: When joining the components
of the rods, take care that your fingers will not be caught in them.
Fibre glass rods: The individual rods are under tension when you insert
them into the second metal eye. Take care that they do not spring out of
your hand you might get hurt.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für wehncke Evolution

Inhaltsverzeichnis