Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting; Montage - Tunze 7077/2 Gebrauchsanleitung

Für co2
Inhaltsverzeichnis

Werbung

Mounting

At all times, the pressure reducing valve
7077/2 has to be operated in upright position
on a CO2 cylinder.
Before the pressure reducing valve is
connected to the full CO2 cylinder, the valve
has to be closed by means of the pressure
adjustment screw (K) (unscrew the screw,
pressure = 0).
Use the union nut (S) to mount the pressure
reducing valve 7077/2 to the CO2 cylinder.
Please make sure that the seal is dry, clean,
and not damaged. Check the tight fit of the
union nut (S) the next day, and retighten, if
necessary. Use the fine adjustment valve (L)
to connect the readily mounted CO2 system
to the gas exit (O) (cf. page 3: Application for
Comline dosing unit).

Montage

Le réducteur de pression doit toujours être
monté verticalement sur sa bouteille de
CO2. Avant le raccordement du réducteur
de pression sur sa bouteille de CO2, il est
important de fermer la vis de réglage (K) (sens
anti-horaire = pression nulle).
A l'aide de l'écrou de serrage (S), montez le
réducteur de pression 7077/2 sur sa bouteille.
Veillez à ce que le joint d'étanchéité soit
sec, propre et non endommagé. Après une
journée d'utilisation, re-vérifiez le bon serrage
de l'ensemble ou effectuez un resserrage
si nécessaire. Raccordez l'utilisation CO2
à la sortie du réducteur de pression (O) au
niveau de la vis de réglage fin (L) (voir page 2,
Exemple d'installation de dosage Comline).


Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis