Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Parameters - Sunsystem BURNIT WBS Active-Serie Montage- Und Bedienungsanleitung

Heizkessel fuer feste brennstoffe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 16
EN
Nominal heat output kW
Min. / Max. heat output kW
Height H mm
Width L / Depth D mm
Mantle volume l
Combustion chamber
Mantle resistance
Δt=20, K
Required chimney draught Pa/
Insulation
Average power
consumption W
Electric power supply V/Hz
Recommended fuel
Loading door size mm
Max. length of firewood
Operating temperature
Operating pressure bar
Cold water inlet A, mm R1¼/232 R1¼/232 R1¼/232 R1¼/232 R1¼/232 R1½/232 R1½/232 R1½/232
Hot water outlet B, mm R1¼/1265 R1¼/1265 R1¼/1265 R1¼/1265 R1¼/1265 R1½/1420 R1½/1420 R1½/1420
Safety line sleeve К, mm G½/1075 G½/1075 G½/1075 G½/1075 G½/1075 G½/1225 G½/1225 G½/1225
Safety heat evacuator inlet
Flue cleaning opening O, mm
Air feed fan W, mm
Burner flange (optional)
Ash-and-soot container X
Control unit U
TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL
WBS
Active
20
20
15÷20
1235
540/860 540/925 600/925 700/925 700/985 700/1105 760/1105 820/1105
60
volume l
58
Pa/
10/0.10
mbar
16/0.16
mbar
Boiler
Doors
60
230/50
wood, humidity 20%; wood briquettes; coal+ wood (50% / 50%)
330/250 330/250 390/250 490/310 490/310 490/310 550/310 610/310
logs mm
400
°C
65 - 80
range
3
Weight kg
254
Е, mm R½/1072 R½/1072 R½/1072 R½/1072 R½/1072 R½/1222 R½/1222 R½/1222
/ outlet
Ø
150
F
mm
Flue
945
J, mm
270
150/70
Drain Y, mm
G½/232
215
Z, ø
176
mm
P
P
Diagram 12 /see page 75/

12.2. Technical parameters

WBS
WBS
WBS
Active
Active
Active
25
30
40
25
30
40
20÷25
25÷30
30÷40
1235
1235
1235
75
82
96
62
73
84
11/0.11
12/0.12
15/0.15
20/0.20
21/0.21
23/0.23
high-efficiency thermal wool
high-efficiency thermal wool
60
60
60
230/50
230/50
230/50
400
500
500
65 - 80
65 - 80
65 - 80
3
3
3
277
299
341
150
150
180
945
945
930
270
300
350
150/70
150/70
150/70
G½/232
G½/232
G½/232
215
215
215
176
176
176
P
P
P
P
P
P
14
WBS
WBS
WBS
Active
Active
Active
50
70
90
50
70
90
40÷50
50÷70
70÷90
1235
1385
1385
106
134
145
97
120
133
26/0.26
22/0.22
26/0.26
24/0.24
38/0.38
47/0.47
60
110
110
230/50
230/50
230/50
500
600
600
65 - 80
65 - 80
65 - 80
3
3
3
370
444
487
180
200
200
930
1065
1065
350
350
380
150/70
150/70
150/70
G½/232
G1/232
G1/232
215
215
215
176
176
215
P
P
P
P
P
P
WBS
Active
110
110
90÷110
1385
162
160
28/0.28
56/0.56
110
230/50
600
65 - 80
3
507
200
1065
410
150/70
G1/232
215
215
P
P

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis