Herunterladen Inhalt Inhalt Diese Seite drucken

Wellis Igneus Installationsanleitung Seite 10

Vorschau ausblenden Andere Handbücher für Igneus:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Please assemble the cable in the electric connection bar on the roof. The other end
EN
of the cable is to connect with the stove. After finish cables connection on the roof
please use dust cover on the roof pane.
Stove wood protector
Sand timer and Thermo-hygrometer
Fixed inside sauna. Thermo-hygrometer fixed near the stove, Sand timer fixed on the
opposite location.
Thermo hygrometer
Fix the humidity meter with the
appropriate screw on the side
These wires
are connected
well in our
factory
Please connect
these 3 wire
one by one
The other end is to
connect with the
stove
3-wires cable
wall.
The other
end is to
connected
with the
stove
5-wires cable
Assembled
well in the
factory
Assembled
these 5 cables
one by one
Sand timer

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

SerenisCalidus

Inhaltsverzeichnis