Herunterladen Inhalt Inhalt Diese Seite drucken

Installation ���������������������������������������������������������������� 14 Installatie; Commissioning; Settings - Melitta Cafina XT180 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
Installation
Installation location and storage
• Only in frost-free locations�
• Not outdoors; only in enclosed, dry areas�
• Not in areas with high air humidity (e�g�, areas with
considerable amounts of steam)�
• Not on board vehicles or mobile facilities (please
contact the manufacturer)�
• Level and free from vibrations�
• Sufficient distances from walls and objects due to the
heat generated by the machine:
To the back
To the top
Water connection (depending on version)
Note
Machines with a water connection also have a
water tank and can be filled manually�
• The water connection must be easy to shut off at any
time during operation (shut-off valve)�
• Any relevant national regulations must be observed
when connecting to the water supply, e�g�, EN 61770�
• Comply with the limit values for water pressure in
line with the technical data�
• Only use the tube set supplied and do not extend the
tube� Other or used hose sets must not be connected�
1�
  1  
Using a spanner, gently tighten the tube set with
the inserted seal on the machine� Consult a specialist
if necessary�
2�
  2  
Open the water stop tap at the water supply line�
Electrical connection
• The supply voltage must match the specifications on
the nameplate�
• The supply line must be protected at the site using a
residual current circuit breaker (RCCB) (max� 30 mA)�
1�
  3  
Insert the mains plug�
͵ The socket must be easily accessible during oper-
ation so that the plug can be disconnected in the
event of a fault�
14
At least 5 cm
At least 30 cm

Commissioning

Note
Thoroughly rinse the machine twice with water
when using for the first time or after a longer
standstill time�
1�
  4  
Switch on the main switch�
2�
  5  
Insert the filter insert into the machine�
3� Depending on version:
 6a 
Without water connection: Fill the water tank
with 1�8 liters of water�
 6b 
With water connection: Select the water
quantity "15 cups" with the "Volume preselec-
tion" button�
  7  
4�
Place the jug under the filter�
  8  
5�
Press the "Start/stop" button�
͵ The button starts to flash�
͵
  9  
Wait for the filtering process to finish�
 10 
͵
Three short signals sound at the end of the
filtering process�
6�
 11 
Machines with glass jug: Press the "Start/stop"
button�
͵ The keep-warm function is switched off and the
machine is ready for operation again�
7�
 12 
Empty the jug�
8�
 13 
Repeat the process 1x (steps

Settings

Machines with glass jug: Setting the keep-warm
time for the lower hot plate
1�
 14 
Press the "Settings" button twice�
͵ The display shows a number�
2�
 15 
Press the "Start/stop" button until the required
setting appears on the display: 20 = 20 minutes,
40 = 40 minutes, 1H = 1 hour, 2H = 2 hours,
4H = 4 hours�
3�
 16 
To save, press the "Settings" button until the
display reverts back to the initial state�
Setting the brewing method
The filtering process can be performed with two different
brewing methods:
Continuous brewing (factory setting)
The filtering process is performed without interruption�
 6a / 6b 
to  12 )�
31807 • 20161101

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis