Herunterladen Diese Seite drucken

Sanotechnik D60710 Montage- & Bedienungsanleitung Seite 20

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH
Preparation before installing
1.Check the Qty of components according to packing list or parts list.
2.Check the Qty of materials according to parts list.
3.Check if there is damage on the surface of product components or not.
4.A grounded outlet needed as recommend to use at least 16A with a fuse of the leakage protection
switch.
5.A professional personnel or electricians is needed when installing electrical components.
If can not satisfy above conditions, please stop installing immediately and contact the dea
Tool
Screwdriver
Suggest using power screwdriver
Technology parameters
Rated Voltage:AC230V
Rated Power:2220W
Rated Current:10A
Rated frequency :50~60HZ
Insulated Resistance:>20MΩ
Screw pack list:
1
2
ST5×60
ST4×20
22pcs
12pcs
Parts 130x100x198 cm
Tape Measure
3
4
ST4×40
ST5×70
4pcs
4pcs
3m
Load parameter
Back/Leg heater:AC230V/300W
Front heater:AC230V/500W
Fan:DC12V/5W
Color Light:DC12V/5W
Speaker:8Ω/10W
5
6
ST12×80
ST8×60
3pcs
3pcs
2.5mm
Hexagon Wrench
7
8
20×60×6
2pcs
4pcs
20/30

Werbung

loading