INSTRUCTIONS FOR INSTALLING BAHIA FREESTANDING
Operation 3:
Open the crate and free the bath, leaving it on the pallet. Move the bath using the
premounted straps.
Fig.3
Operation 4:
Position the bath near the floor drain. Lift the bath and place the spacers provided
(16x22 L. 70 cm) underneath it, two per corner (fig. 3).
Fig.4
Spacers
10