Herunterladen Inhalt Inhalt Diese Seite drucken

Step By Step Installation - JBL ProFlora u401 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
8
JBL ProFlora Count bubble counter
9
Anti-rust JBL ProFlora SafeStop non-return valve
10
CO
passive reactor JBL ProFlora Taifun
2
11
TopStop CO
hose JBL ProFlora T3
2
12
CO
permanent test JBL Test Set permanent CO
2

12.1 Step by step installation

1.
For the m601 – m603 and m1003 sets first attach the extensions to the JBL Taifun
CO
Passive Reactor (10) according to the height of the aquarium. Rinse the reactor in
2
lukewarm water and place it vertically in the aquarium in a location with a slight current of
water. The upper edge should be approx. 2 cm under the surface of the water. The slits
of the individual modules should be as clear as possible from obstruction by plants or
decorations.
2.
Cut off the CO
plug the free ends of the hose onto the hose supports of the non-return valve (9). Check
the direction of flow.
3.
Install the CO
instructions.
4.
Select a suitable place to fit the bubble counter, where it can be easily observed. Install
the bubble counter (8). The bubble counter can either be attached using suction pads
(e.g. to the outside of the aquarium) or to a wall or surface of a piece of furniture with the
enclosed screws. Cut the CO
hose screw connections of the bubble counter. Check that the supply hose is attached
to the connection with the long pipe in the bubble counter. Open the bubble counter by a
quarter turn (bayonet) and fill with water to up the mark before closing again.
hose (11) with scissors about 20 cm from the upper end of the reactor and
2
permanent test (12) in the aquarium according to the enclosed
2
hose to the correct length and attach the free ends to the
2
plus pH
2
GB
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis