Herunterladen Inhalt Inhalt Diese Seite drucken

Facom 715 Bedienungsanleitung Seite 28

Digitales multimeter mit isolationsprüfung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 29
Clean the terminals as follows:
1. Set the range switch to OFF position and remove the test leads from the meter.
2. Shake out any dirt which may exist in the terminals.
3. Soak a new swab with alcohol.
4. Work the swab around in every terminal.
Replacing the Battery and Fuse
Warning
To avoid false readings, which could lead to possible electric shock or personal injury, replace the batteries as soon as the low
battery indicator (
test leads from the meter before opening the back cover or the battery cover.
To replace the batteries, remove the screws on the battery cover, remove the battery cover, replace the exhausted batteries with new
batteries of the same type (AA or equivalent). Reinstall the battery cover and the screws.
400mA, 690V FAST, Min. Interrupt Rating 20000A
To replace the fuse, move the screws on the back cover, remove the back cover, replace the fuse with a new one of the same ratings.
Rejoin the back cover and reinstall the screws.
ACCESSORIES
Owners manual : 1 piece
Insulation-test lead : 1 set
Insulation measurement cable: 715-ITL
Probe: ref 714A-L
Fuse: Ref 714A-F
DISPOSAL OF THIS ARTICLE
Dear Customer, If you at some point intend to dispose of this article, then please keep in mind that many
of its components consist of valuable materials, which can be recycled.
Please do not discharge it in the garbage bin, but check with your local council for recycling facilities
in your area.
) appears. To prevent damage or injury, install only replacement fuse of the same ratings. Remove
28

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis