5
Mounting
If you intend to mount multiple products, start by creating a mounting plan
with the appropriate mounting locations. Then label the products with
numbers or the corresponding mounting location to help avoid confusion
of mounting locations.
5.1
Preparing mounting
Prior to mounting, verify that the solar-operated energy storage module
has been charged.
- Regular daylight is sufficient for charging the energy storage module.
- Exposure to direct sunlight reduces the charging time.
5.2
Mounting the product
Verify that the mounting position of the product conforms to the mounting
plan.
1. Choose an installation site without direct exposure to sunlight.
- Direct sunlight causes incorrect temperature values.
2. If the product is used in darker environments, install a lithium battery type
½ AA.
5.2.1
Connecting the probe
1. Connect the probe to the product (see chapter "Application exam-
ple(s)").
5.2.2
Mounting the bracket holder
If required, you can use the enclosed holder. Fixate the holder using the
enclosed adhesive dots.
Mounting
1. Mount the holder to a wall or to a
pipe.
Teach in the product before plug-
ging it onto the holder.
2. Push the product onto the holder
until it snaps in.
EN
10
FTM