15 Push assembled door panels into base bar (3L). Ensure that bottom slide (GD) is pushed
into base bar (3L). Then fix upper door panel to upper slide (G2) by using (F3) bolts. Please see
picture below.
Note: Ensure correct line-up of door;
realign holes with door panel.
Part
No.
Qty.
- 111 -