Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

English

Daily Switch-On

Preliminary operations
Check that the coffee beans receptacle (2) is correctly positioned on
the grinder-doser. Lift the lid (1) and fill with coffee beans. Check that
the gate (3) is open and push towards the inside.
Switching on – general instructions
"Ensure that the mains switch is on before switching
on the appliance."
WARNING: this appliance is provided with delayed
"ON/OFF" automatic device
Automatic Grinder-Doser
Turn the appliance on by turning switch (11) to "1" and check that the
indicator light "ON" (10) is lit.
This appliance has an automatic cut-off switch that intervenes every
time the doser (6) has sufficient ground coffee. If switch (11) is left on
position "1" the grinder-doser will start automatically every time the
level of ground coffee needs to be filled up.
At the end of the working day, switch off the appliance by turning the
general switch (11) to "0". The indicator light (10) switches off.
Operating Instructions
Regulating the grind
N.B. These operations must be performed with the appliance off.
The grade of the coffee grind is regulated by pressing pin (15) downwards
and with the other hand pressing the ring nut (4).
The changes can be verified by checking the graduated indicator (18).
If the coffee is dispensed too slowly, the grind of the coffee beans is
too fine. Turn the ring nut (4) clockwise to obtain a coarser grind (the
numbers on the graduated indicator increase: 2-3 - 4 - ...).
If the coffee is dispensed too quickly, the grind of the coffee beans is
too coarse. Turn the ring nut (4) anticlockwise to obtain a finer grind
(the numbers on the ring nut decrease: 4-3- 2 - ...).
1
2
6
10
18
English
3
11
4
18
15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis