10. Disconnect the distribution box from its quick release
mountings.
11. Remove and transfer the distribution box with cable
grommet hose to the new unit.
20
A
Press
B
A
Press
12. Secure the distribution box in the quick release
mountings and the ground cable in the stand frame.
13. Install the panel mounting for the display (two
screws) on the new unit.
14. Install the display and connect the wiring connect-
or(s) to the display.
Cooling module and heating/brine pipes,
transferring
1. Remove the upper securing plate from the shut off
valves (QM32, QM33, QM34) and separate the con-
nections.
1
NIBE F1226/F1245/F1255 | GB