Herunterladen Inhalt Inhalt Diese Seite drucken

Operating Of The Pump; Generation Of Pressure - Tecsis 1351.085.005 Betriebsanleitung

Prüfpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Betriebsanleitung - Operating manual
4
Operation of the pump
4.1

Generation of pressure

First, check whether the change-over valve (4) has to be actuated (see
sticker on the device). For this purpose use a pen or a small screw-driver.
The encasement of the switch is intended to help prevent unintentional
actuation.
Never actuate the change-over valve (4) when the hand test
pump is under pressure or vacuum! Actuate the change-over
valve only when the relief valve is open.
Please make sure that the pressure relief valve (3) is not closed
completely.
Turn the fine adjustment valve (2) anticlockwise up to the end (smooth
stop can be felt).
(1) Pressure connector for refer-
ence instrument, G ½"
female rotating
(2) Fine adjustment valve
(3) Pressure relief valve
(4) Change-over switch for
pressure/vacuum generation
(5) Handles
(6) Adjustable knurled nut for
the adjustment of the
delivery rate of the pump
(7) Pressure connection for test
specimen, G ¼"
(8) Test tube, length 1 m
15

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis