Herunterladen Inhalt Inhalt Diese Seite drucken

Prior Initial Operation - TAC V-88 Bedienungsanleitung

Röhren-vollverstärker
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

PRIOR INITIAL OPERATION: PROTECTIVE
Remove the protective transport cover pads from
the tubes prior initial operation. First of all you
have to remove the cover from the appliance.
Manually unscrew the aluminum plates on the
The then visible foam polystyrene cushions underneath the cover of the appliance must be removed prior
initial operation. Remove the cushions and preferably store them in the original packaging.
Please fix the cushions at their original positions when transporting the appliance in the future.
26
tube·amp·company
TRANSPORT COVER
metal supports and remove the former. Do not use
inappropriate tools. After that you may lift up the
cover from the appliance.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis