Herunterladen Inhalt Inhalt Diese Seite drucken

Shipping & Packing; Receiving Inspection Of Quickchange Resin Bags; Receiving Inspection Of Entire Unit; Claims - unGer HYDRO POWER DI12x Montageanleitung Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Quality Tools for Smart Cleaning
2. Shipping & Packing

2.1 Receiving inspection of QuickChange resin bags

Unger QuickChange resin bags are carefully checked and packed prior to dispatch.
However, damages caused by shipment cannot be ruled out.
Check packing for exterior damage while delivering person is still present.

2.2 Receiving inspection of entire unit

Check device for completeness based on illustration (page 8).
Based on your ordered part number following parts my be optional:
TDS-meter (5), Cart (9), Wheels (10)
Visual inspection of device for shipping damages.

2.3 Claims

Have delivering person confirm any damages to the packing.
Save packing and shipping carton for possible return.
Reports of shipping damages that have not been confirmed by the transport company cannot
be accepted.
Damage detected only after start-up must be reported to the dealer without undue delay, at
the latest, however, 6 months after purchase.
The dealer's invoice is absolutely necessary to confirm the date of purchase.
In addition, the general terms and conditions of Unger apply.
6
Hydropower dI
Shipping & Packing
www.ungerglobal.com/hydropower

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis