Herunterladen Diese Seite drucken

Flott TBSM 75 Bedienungsanleitung Seite 10

Werkzeugmaschinen

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

GB
5.0 Delivery, transport, handling and storage
ATTENTION! Always check delivery for completeness and damage!
The carrier (forwarder or railway) is to be informed immediately in case of transport damages. (s. yellow leaflet)
The machine is packed on pallet, it has to be transported by lift or fork truck. The packed machines are no
staple commodities!.
- sanding machine , - one sanding belt coarse – grained, - operation instructions.
6.0 Setting up the machine
The grinding machine should be placed on a level surface and screwed with 4 screws. Check that the belt moves
freely and is not impeded in any way.
7.0 Installation
Please check whether type of current, current voltage and fusing agree with the prescribed values. There must be a
protective earth terminal. Mains fusing 10 A. For conecting the machine we recommend the cable No.:488761 or No.:
488762 (230V)
8.0 Belt tracking (fig.3 / 4)
When first starting the machine, the belt will not run centrally on the contact wheel. This is corrected by turning the
star knop screw (15) Clockwise - belt moves towards the left, Anticlockwise - belt moves towards the right.
9.0 Changing the belt
Ensure that the machine is stopped completely! (fig.1 / 2)
a. Unscrew star knob (23) and clamping lever (24)
b. Remove covers (4, 6) and the fence (3, 10)
c. Slacken the belt with the star knob screw (18)
d. Replace the belt.
Attention! Take care of correct direction of rotation.
e. Tighten the belt by moving the star knob screw (18) upwards
f. Reassemble covers (4, 6), pull star knob (23) and clamping lever (24).
g. Adjust the belt with the star knob screw (17)
10.0 Contact grinding
Normal grinding, grinding against the contact wheel (13).
When working on the contact wheel, place the working piece parallel on the support and grind in 90° angle to the
grinding belt.
In case of grinding at the grinding arm, the fence can be used as grinding base - there fore screw the fence (10) on the
holder (14). In case of contact grinding do not remove the covers (1,6) (fig.2)
11.0 Surface grinding
Open the cover (6) and push the material hardly against the graphit grinding base (8).
The fence (3) is adjustable by loosening the clamping lever (24) up to 45°. Do not remove the cover (1) by phase -
grinding. The cover (1) is to be adjusted to the corresponding material thickness, therefore loosen the star knob nut
(23). After adjusting tighten the star knob (23). (fig.1 / 2)
12.0 Adjusting of grinding arm
The grinding arm is steppless adjustable in horizontal and vertical position. Loosen screws (26) with the hexagon
socket wrench, adjust the angle and tighten the screws. (fig.3)
14.0 Maintenance
Ensure that all moving parts are kept clean and that the belt is in good condition.
Never use a badly worn or torn belt.
15.0 Exhausting
For continous operation a dust exhaust system is necessary!
(exhaust system capacity for TBSM 75 min. 400 m³/h)
11
371476 D/GB

Werbung

loading