Herunterladen Diese Seite drucken

Care & Maintenance - Palram Snap & Grow 8x8+4 Extension Montageanleitung

Vorschau ausblenden Andere Handbücher für Snap & Grow 8x8+4 Extension:

Werbung

IMPORT AN T
Please read these instructions
carefully before you start to
assemble this greenhouse.
Please carry out the steps in
the order set out in these
instructions.
Keep these instructions in a
safe place for future
Safety
We strongly recommend the use of work
gloves during assembly . Do not attempt
to assemble the greenhouse in windy or
w e t
c o n d i t i o n s .
Do not touch overhead power cables
with the aluminum pro les. Always wear
shoes and safety goggles when working
with extruded aluminum. Dispose of all
plastic bags safely - keep them out of
reach of small children. The greenhouse
must be positioned and xed on a at
level surface. Do not lean against or push
the greenhouse during construction.
Keep children away from the assembly
area. Do not position your greenhouse
in an area exposed to excessive wind.
Do not attempt to assemble this
greenhouse if you are tired, have taken
drugs or alcohol or if you are prone to
dizzy spells. If using a step ladder or
power tools ensure that you follow the
manufacturers safety advice. Hot items
such as recently used grills, blowtorches,
should kept away from the greenhouse
w
a
l
l
s
We recommend the greenhouse is
bolted to a concrete base or slabs ( x
hinges are not supplied). However, if you
directly in to the concrete ensure there are
no hidden pipes or cables in the ground
b e f o r e
i n s e r t i n g
t h e
General Advice
This multi-part assembly is best achived
by two people. Allow at least half a day for
a s s e m b l y
p r o c e s s .
Site selection instruction-choose a sunny
level position away from overhanging
trees. If you are xing your greenhouse
directly to a solid concrete foundation use
the pre drilled holes in the metal base
supplied. The component parts should be
checked and laid out close at hand. Keep
all small parts (screws etc.) in a bowl so they
Care & Maintenance
When your greenhouse needs to be
cleaned, use a mild detergent solution and
rinse with cold clean water. DO NOT use
acetone, abrasive cleaners or other special
detergents to clean the clear panels.
For replacement parts - call our service line.
For additional information please visit our
w e b
s i t e :
w w w . p a l r a m . c o m
Tools & Equipment
Tape measure
Work gloves
Plastic or rubber mallet
Phillipshead screwdriver
Step ladder
Scissors
Spirit level - For base alignment
Cloth
.
Sort the parts and check against the
.c o n t e n t s
p a r t s
Carry out the assembly steps in the
.order set out in the instructions
The front of the greenhouse is the
wall including the door, and the back
.i s
t h e
o p p o s i t e
p e g s .
After assembly t the greenhouse to
the base using connectors no. 35 and
t the whole unit to a leveled nal
.p
o
s
i
t
You may use Silicon lubricant spray in
order to help you slide the pro les on
Polycarbonate panels. Use
t h e r u b b e r m a l e t i f
necessary. Avoid shaking
.the plastic connectors
Notes (by steps)
step
4
Pro le 848 should be placed on the left
hand side to be connected to pro le 849.
Pro le 848 is the one with the connector
a t
t h e
step
5
After connecting pro les 816 to each
other clean the connection area using a
cloth. Place the cover strip on the
conection only when it is clean and dry.
press the cover strip from one side of the
connection to the other as mentioned
i n
p i c t u r e
step
8
Pro le 835 & 836 should be aligned and
connected according to the illustration
on page 8 a & b. plug 23 should be
inserted to each connection while the
two dots on the front of the plug should
step
10
Use part 95 as a template in order to
measure the gap between posts 800 & 801
of the greenhouse wall and roof area.
step
12
l i s t
Pro le 841 should be placed on the right
hand side. Pro le 840 should be placed
the left hand side when viewed from the front
step
13
w a l l
Slide the panel 566 till the end of the rail
and insert it into it's nal position
a s s h o w n i n i l l u s t a r t i o n c .
i
o
n
step
20
Be careful to assemble the window in
the position as shown on picture 19 a.
pro le 809 should be placed while the
vent is closed to cover any gap. Ensure
pro le 809 is tted correctly as shown
on picture 21 b. The lip on 809 should face
toward the gutter.
step
23
Slide the panel 558 till the end of the
rail and insert it into it's nal position
as shown in illustartion a and b.
step
24
e n d .
Step inside the greenhouse and turn all
23 plugs a 1/4 of a turn clockwise.
step
25
Pro les 814 should be inserted from the
four corners of the greenhouse, then
insert pro le 815 in between them.
step
26
4 .
Ensure you use long screw 450 to secure
the door catch 363 as shown in illustration b.
8x8 package
8x4 Extenshion package

Werbung

loading