Herunterladen Inhalt Inhalt Diese Seite drucken

Customer Service; Safety Advice; Before Assembly; Care & Maintenance - Palram Glory 6'x8' Montageanleitung

Inhaltsverzeichnis

Werbung

IMPORTANT
Please read these instructions carefully before you start to assemble this greenhouse.
Keep these instructions in a safe place for future reference.
» Customer Service
For assistance with assembly or for replacement parts - please log onto our website
or call our service line (number is on the title page).
Additional information can be found at our website: www.palramapplications.com
» Safety Advice
It is of utmost importance to assemble all of the parts according to the directions.
Do not skip any step.
We strongly recommend using work gloves during panels' sliding.
Always wear shoes and safety goggles when working with extruded aluminium.
If using a step ladder or power tools make sure that you follow the manufacturer's
safety advice.
Do not touch overhead power cables with the aluminium profiles.
Do not attempt to assemble the greenhouse in windy or wet conditions.
Dispose of all plastic bags. Keep them out of reach of small children.
Keep children away from the assembly area.
Do not lean against or push the greenhouse during construction.
Do not position your greenhouse in an area exposed to excessive winds.
Do not attempt to assemble this greenhouse if you are tired, have taken drugs or
alcohol or if you are prone to dizzy spells.
Hot items such as recently used grills, blowtorches etc. must not be stored in the
greenhouse. Make sure there are no hidden pipes or cables in the ground before
inserting the pegs.
This product is designed to be used mainly as a greenhouse.
Note: You should anchor the greenhouse directly to a solid foundation; Make sure
that there are no obstructions between the assembly area and the final position.
» Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and rinse
with cold clean water.
DO NOT use acetone, abrasive cleaners or other special
detergents to clean the clear panels.
» Tools & Equipment
Work gloves
Phillips head screwdriver
Adjustable Spanner /Wrench
Leveler
Tape measure
Step ladder
Scissors
Electric screwdriver ( lOmm, 7mm, Phillips)
Lubricant (Optional)
T001 - Special tool for Screws 411 and nuts 412
» Before Assembly
v Selecting a site:
- The greenhouse must be positioned and fixed on a flat level surface.
- Choose a sunny position away from overhanging trees.
V We strongly recommend this greenhouse to be secured directly to a solid concrete
foundation.
V This is a multi -part assembly best achieved by two people. Allow at least
half a day for the assembly process.
V Take all components & parts out of the packages. Sort the parts and check against the
content parts list.
Parts should be laid out close at hand. Keep all small parts (screws etc.) in a bowl so they
do not get lost.
I
Please note multi -sided profiles are used in this greenhouse. As a result some holes in
the profiles are not used during assembly.
Please review entire instructions before starting. Carry out the assembly steps in exact
order.
Prior to fitting the Automatic Vent Opener, the power -tube has to be cooled by placing
it in a refrigerator for approximately 30 minutes.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis