Herunterladen Inhalt Inhalt Diese Seite drucken

Starting Operation - CST CHCTS-EU Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
Operation

Starting Operation

f Observe the mains voltage! The volt-
age of the power supply must correspond
with the data given on the nameplate of
the battery charger. Battery chargers
marked with 230 V can also be operated
with 220 V.
Charging Procedure
Note: The charging procedure is only possi-
ble when the battery temperature is within
the allowable charging temperature range,
see Section "Technical Data".
CHCTS-EU: Select the battery charger,
which is equipped with the matching mains
plug for your mains supply.
CHNMEU: Connect the mains cable with the
matching mains plug for your mains supply to
the battery charger or replace the mains
cable accordingly.
The charge procedure begins as soon as the
mains plug of the battery charger is plugged
into the socket outlet and the charger plug 1
is plugged into the measuring tool or the
rechargeable battery.
The charge procedure is not automatically
ended. Therefore, disconnect the battery
charger from the mains supply after charging.
The battery charger and the rechargeable
battery are protected against overcharging.
Battery Charge Indicator
CHCTS-EU:
– The battery charge indicator 2 lights up
red during the charge procedure.
– The battery charge indicator 2 lights up
green when the rechargeable battery is
fully charged.
16 | English
2 610 A12 003 • 13.8.09

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

1 608 m00 2n4Chnmeu1 608 m00 2ne

Inhaltsverzeichnis