Herunterladen Inhalt Inhalt Diese Seite drucken

Montage Der Bodenschiene - Interline ARUBA Montageanleitung

Inhaltsverzeichnis

Werbung

flush with the prepared ground surface.
3) ASSEMBLING BOTTOM RAIL
Schritt 1
STEP 1:
Before proceeding, remove the steel wall from carton and stand on a 3'x3'
board inside pool area as shown at right. Put the liner, (leaving it in the
carton) inside pool area.
STEP 2:
Loch
Insert the bottom rails around the entire perimeter using lower joints on the
Nagel
circular portion of the pool.
5x5 cm
Leave one section open that will be nearest to where you will locate your
Mittelpunkt
filter.
Kennzeichnen Sie abhängig von der Größe des Pools
(siehe Grundriss oben) den Umkreis des Arbeitsraumes
(60 cm).
Schlagen Sie dazu einen Holzpfahl in den Mittelpunkt
und ziehen Sie von dort aus einen Kreis. Die Fläche
innerhalb des Kreises muss sauber und eben sein. Um
einen stabilen Untergrund zu bekommen, ist es besser,
Unebenheiten abzutragen, als diese mit losem Sand
aufzufüllen. Entfernen Sie Grassoden, Steine, Wurzeln
und andere spitze Gegenstände. Denken Sie daran,
dass Ihre Poolkonstruktion waagerecht auf sauberem
Boden stehen muss (vorzugsweise auf gesiebtem
Sand).
Schritt 2
Bodenschiene
Mittelpunkt
Wasserwaage
Verwenden Sie einen Pfahl als Mittelpunkt und ziehen
Sie einen Kreis mit dem Durchmesser Ihres Pools.
Befestigen Sie hierfür einen Draht oder eine Schnur
am Holzpfahl und auf der andere Seite an einem
Schraubenzieher oder einer Reißnadel (als Maß gilt
die Hälfte des Pools vom Pfahl aus gemessen). Legen
Sie die Bodenschienen zu einem Kreis, indem Sie jede
Schiene mit der Rille nach oben in ein Verbindungsstück
schieben (siehe Skizze). Achten Sie darauf, dass Sie
die Schienen bis an die Laschen der Verbindungsstücke
schieben (siehe Foto). Legen Sie als zusätzliche
Sicherheitsmaßnahme, eine Betonplatte (bündig mit
Bodenhöhe) unter jedes Schienenverbindungsstück,
wenn die Bodenbeschaffenheit nicht optimal ist.
d) Do not fill low spots in the area where pool wall will rest. as setting may cause your pool to
become out of level. Making sure pool bottom is flat.This is a must.
e) If your site is not on firm soil, use 2" patio blocks for the base of the wall Care should be
taken to center a patio block under each bottom plate. The top of the patio blocks should be
flush with the prepared ground surface.
3) ASSEMBLING BOTTOM RAIL
STEP 1:
5x10 cm
Before proceeding, remove the steel wall from carton and stand on a 3'x3'
board inside pool area as shown at right. Put the liner, (leaving it in the
carton) inside pool area.
STEP 2:
Insert the bottom rails around the entire perimeter using lower joints on the
circular portion of the pool.
Leave one section open that will be nearest to where you will locate your
filter.
Wasserwaage
Betonplatte
Abdeckplatte
M O N T A G E - / A U F B A U A N L E I T U N G A R U B A R U N D - P O O L - S E I T E 4
3) ASSEMBLING BOTTOM RAIL
STEP 1:
Before proceeding, remove the steel wall from carton and stand on a 3'x3'
board inside pool area as shown at right. Put the liner, (leaving it in the
carton) inside pool area.

MONTAGE DER BODENSCHIENE

STEP 2:
Insert the bottom rails around the entire perimeter using lower joints on the
circular portion of the pool.
Schritt 3
Leave one section open that will be nearest to where you will locate your
filter.
30 cm
2
SCHRITT A:
Zunächst die Stahlwand aus dem Karton nehmen und
die Stahlwand auf einem Stück Karton von 50x50 cm
stellen und diese in den Schwimmbeckenbereich stellen.
Die Folie (noch im Karton) im Schwimmbeckenbereich
hinstellen:
SCHRITT B:
Die Bodenschiene um den vollständigen Umfang mittels
Bodenverbindungsstücken um den rundlaufenden Teil
des Schwimmbeckens herum anbringen.
Den Teil offenlassen, der sich der Stelle am nächsten
befindet, an der Sie den Filter installieren wollen.
Eine Terrassenplatte unter jedem
Bodenverbindungsstück im Rundungsbereich anbringen.
Before proceeding to the next step, place a large amount to
sifted earth in the middle of the circle. (see chart for the
amount on the first page.)
Before proceeding to the next step, place a large amount to
Sifted earth should not contain any pebbles.
sifted earth in the middle of the circle. (see chart for the
amount on the first page.)
Place a patio block under each lower joint around curved
area.
± 1 cm
Sifted earth should not contain any pebbles.
Place a patio block under each lower joint around curved
area.
Obere Seite Terrassenplatte
bündig zur Bodenoberfläche
2
Before proceeding t
sifted earth in the m
amount on the first
Sifted earth should
Place a patio block
area.
2

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Interline ARUBA

Inhaltsverzeichnis