Herunterladen Diese Seite drucken

Maintenance Instructions; Mounting Sequence - Puris Kera trends Montageanleitung

Vorschau ausblenden Andere Handbücher für Kera trends:

Werbung

6$)(7< $'9,&(
‡ The mounting must only be done by experts.
‡ Warning: defective mounting is dangerous!
‡ Check whether the wall is suitable for the mounting and
that the fasteners are strong enough for the forces involved.
‡ Please read through the mounting instructions carefully
before mounting in the bathroom.
‡ The enclosed fastening material is only suitable for solid
walls of sufficient load-bearing strength.
Electrical installations should only be carried out by a
specialist electrician ',1 9'(  9'(  
‡ Electrified, mirrored cabinets and flat mirrors must be located at
a minimum distance of 600 mm away from the bath or shower.
‡ The safety regulations and standards of the particular coun-
tries must be observed.
IMPORTANT INFORMATION
‡ Inspect the packaging for external damage when it is delivered.
‡ Please check the number of bathroom cabinets supplied and
WKH DVVRFLDWHG VHWV RI LURQPRQJHU\ VFUHZV FRYHU FDSV
KDQGOHV HWF DJDLQVW WKH GHOLYHU\ QRWH RU WKH DUWLFOH·V ODEHO
on the packaging.
‡ Caution: only remove the protective caps on the mirrored
FDELQHW·V GRRUV DIWHU PRXQWLQJ WKH GRRUV LQ RUGHU WR DYRLG
damaging edges of the mirrors.
‡ Use suitable spacers or distance blocks to even out the
existing differences in level caused by coverings applied to
the walls, e.g., partial tiling.
‡ Reinforce any walls of insufficient load-bearing strength.
‡ The drilled dimensions are measured from the FFL according
to the dimensioned layout.
‡ Fasten the cabinets with the suspension rails:
- :DVKVWDQG EDVH FDELQHW
 7DOO FXSERDUG ZLWK  PP ZLGWK
‡ Always fasten the hanging bar to the wall with 2 screws!
‡ The horizontal spacing between the cabinets can be chosen freely.
‡ 'R QRW WLJKWHQ ZDWHU WDS DQG VLQN SRSXS WRR ILUPO\
‡ %RQGLQJ EHWZHHQ ZDVKVWDQG DQG VKHOI ZLWK VLOLFRQH
WUDQVSDUHQW DQG VROYHQWIUHH 
‡ +DQGOH JODVV ZDVKVWDQG ZLWK FDUH
TOOLS
‡ -LJVDZ
‡ Drill and battery-operated screwdriver
‡ Stone drill bit of 8 mm and 14 mm dia.
‡ :RRG GULOO ELW RI  PP DQG  PP GLD
‡ Folding metre rule and measuring tape
‡ Spirit level
‡ Screwdriver with a 3.5 mm tip for Phillips screws
‡ 4 mm Allen key
‡  PP  PP DQG  PP ZLGH RSHQMDZHG VSDQQHU
‡ Screw clamps
‡ Pencil
‡ 6LOLFRQH VHDODQW WUDQVSDUHQW DQG VROYHQWIUHH
KEEP THE INSTRUCTIONS IN A SAFE PLACE
i
Caution: keep the instructions safely because they contain
information about installing and operating the products.

MAINTENANCE INSTRUCTIONS

‡ Caution: do not use any chemicals, aggressive detergent
paste or scouring powder.
‡ 7KH EHVW ZD\ RI FOHDQLQJ WKH FDELQHW LV WR XVH D GDPS FORWK
with some mild washing-up liquid.
‡ 7DNH FDUH WKDW QR UHVLGXH IURP GURSOHWV UHPDLQV RQ WKH ORZHU
edge of bathroom cabinets.
‡ 3ROLVK WKH PLUURU ZLWK D GDPS FORWK RU FKDPRLV OHDWKHU
‡ 7KH ZDVKEDVLQ FDQ EH HDVLO\ FOHDQHG ZLWK DQ\ RI WKH XVXDO
non-abrasive cleaning agents.

MOUNTING SEQUENCE

i
Illustrations in the appendix
1. Remove doors and drawers (Fig. A/A1)
2. Mounting the lights (Figs. B/B1/B2/B3)
The electrical mains supply cable must be voltage-free!
3. Suspending the cabinets
Mirrored cabinet or flat mirror
FHQWUH RI WKH PLUURUHG FDELQHW
FHQWUH RI WKH ZDWHU VXSSO\ FRQQHFWLRQ
Upper cabinets, centre cabinets, tall cabinets
Plug-in board
High board
:DVKVWDQG EDVH FDELQHW:DVKVWDQG
FHQWUH RI WKH ZDVKVWDQG EDVH FDELQHW
FHQWUH RI WKH ZDWHU VXSSO\ FRQQHFWLRQ
4. Aligning the flat mirror (Fig. C)
5. Aligning the cabinets (Fig. D)
6. Mount fitting board (Fig. E)
7. Mount washstand
For ceramic washstand:
3XW ZDVKVWDQG LQ SODFH DOLJQ PRXQW )LJ )
6HDO ZDVKVWDQG )LJ )
For glass washbasin:
'ULOOLQJ RI FOHDUDQFH KROH )LJ *
Sawing of cut-out for washstand )LJ *
$WWDFKLQJ VKHOI IRU ZDVKVWDQG )LJ *
0RXQWLQJ RI VKHOI )LJ *
*OXH ZDVKVWDQG ZLWK VKHOI )LJ *
7LJKWO\ SUHVV WRJHWKHU ZDVKVWDQG ZLWK VKHOI )LJ *
Sealing the washstand )LJV **
For top-fitted washstand:
Sawing of cut-out for washstand )LJ +
$WWDFKLQJ VKHOI IRU ZDVKVWDQG )LJ +
0RXQWLQJ RI VKHOI )LJ +
0RXQW WKH FDELQHW DQG DOLJQ
$OLJQ WKH ZDVKVWDQG DQG PDUN
5HPRYH WKH ZDVKVWDQG DQG FDELQHW
0RXQW WKH ZDVKVWDQG )LJ +
0RXQW WKH FDELQHW
6HDO WKH ZDVKVWDQG DQG FDELQHW )LJ +
8. Affixing of the fitting (Fig. I)
Caution: Use attached rubber seal.
'R QRW WLJKWHQ ILWWLQJ WRR ILUPO\
9. Screwing on the shelf (Fig. J)
Caution: do not drill through the shelf!
Use the screws supplied.
10. Mount doors and drawers (Fig. K/K1)
11. Adjustment of door damping (Fig. L)
12. Aligning the doors (Figs. M/M1/M2)
13. Glue handles onto the door of the mirrored cabinet (Fig. N)
14. Adjusting the folding hinge (Fig. O)
15. Adjusting the drawer (Figs. P/P1)
CHANGING THE FLOURESCENT TUBE
i
Figures: page 29 (Q)
The electrical mains supply cable must be voltage-free!
3

Werbung

loading